Brian Floyd says: Had a busy couple of days. Got the cockpit liner mold pulled, installed the fuel tank, put rigging tubes going to the forward locker, put flotation foam in the upper sides of the cockpit, prepped the console location, mocked up under gunwale rod holders and installed the rod tubes.
Let’s see how far we can take it tomorrow.